Proline PLJW129 Preparation, Inspect Range Hood, Tools You’Ll Need, Prepare Ductwork, Test

Models: PLFW108 PLJW125 PLJW109 PLJW129

1 22
Download 22 pages 40.12 Kb
Page 12
Image 12
PREPARATION

8PROLINE RANGE HOODS

PREPARATION

INSPECT RANGE HOOD

1. Check contents of box:

range hood

wall or ceiling mounting bracket small bag of hardware

chimney (only on certain models)

support brackets (only on certain models) transition duct (only on certain models)

2. Test

plug in and test controls, lights, fan

inspect for any damage during shipping

you must report any damage to Proline within 7 days for a refund

TOOLS YOU’LL NEED:

power drill screwdrivers drill bit

tape measurer marking pencils

duct tape aluminum backed level

wall anchors (Make sure to buy the right kind. Hardware stores can help.)

PREPARE DUCTWORK

Ductwork should already be punched through celling (or the wall if ceiling is not an option) and ready to hook up to the range hood before beginning installa- tion. See venting requirements on page 7 of this user manual.

If you are not venting to the outside of your home, be sure to install your charcoal filters before mounting the hood to the wall. See information on char- coal filters on page 5 of this manual.

Page 12
Image 12
Proline PLJW129, PLJW109 Preparation, Inspect Range Hood, Tools You’Ll Need, Prepare Ductwork, Check contents of box, Test