Raypak 2072B-2342B dimensions Installation, Start-Up, Training, END of Section

Models: 2072B-2342B

1 5
Download 5 pages 29.28 Kb
Page 5
Image 5

3.1INSTALLATION

A.Must comply with:

1.Local, state, provincial, and national codes, laws, regulations and ordinances

2.National Fuel Gas Code, ANSI Z223.1/NFPA 54 – latest edition

3.National Electrical Code, ANSI/NFPA 70 – latest edition

4.Standard for Controls and Safety Devices for Automatically Fired Boilers, ANSI/ASME CSD-1, when required

5.Canada only: CAN/CSA B149 Installation Code and CSA C22.1 CEC Part I

6.Manufacturer’s installation instructions, including required service clearances and venting guidelines

B.Manufacturer’s representative to verify proper and complete installation.

3.2START-UP

A.Shall be performed by Raypak factory-trained personnel.

B.Test during operation and adjust if necessary:

1.Safeties (2.2 - F)

2.Operating Controls (2.3)

3.Static and full load gas supply pressure

4.Gas manifold and blower air pressure

C.Submit copy of start-up report to Architect and Engineer.

3.3TRAINING

A.Provide factory-authorized service representative to train maintenance personnel on procedures and schedules related to start-up, shut-down, troubleshooting, servicing, and preventive maintenance.

B.Schedule training at least seven days in advance.

END OF SECTION

Project Name / Date

5

Page 5
Image 5
Raypak 2072B-2342B dimensions Installation, Start-Up, Training, END of Section