L.Pool Heater Pump - Refer to Equipment Schedule
M.SureRack™ Pool heater Stacking Kit
1.The pool heaters shall be stacked directly one on top of the other, without offset, to minimize footprint.
2.The stacked pool heaters shall be
N.Manual Bypass
1.The heater shall be equipped with an external bronze pump and bypass arrangement designed to maintain the water entering the heater at the proper temperature that will prevent condensation and scale in the heat exchanger. The entire waterway shall be
O.Cold Water Run System
1.The pool heater(s) shall be configured with a cold water run automatic proportional
2.The cold water run system shall be configured with a variable speed pump that is controlled by
a
3.The control shall have a temperature setting dial located on the face of the board. The temperature range of the dial shall be 105ºF to 120ºF. The PID Logic shall be capable of limiting system overshoot to a maximum of 10ºF on initial
4.The cold water run system shall be completely wired and mounted at the factory.
5.The control shall have the following diagnostic LED’s:
a.Call for heat
b.
c.Inlet temperature error
d.Sensor out of range
6.The controller shall have the capability to add optional alarm contacts
P.Low Gas Supply Pressure Manifold
1.The pool heater(s) shall be
Q.FlexGas™
1.The pool heater(s) shall be configured with a patented,
a.The gas switching shall be accomplished by a keyed
b.The FlexGas manifold shall as a minimum have two ON/OFF solenoid shutoff valves for natural gas, and a minimum of one ON/OFF solenoid shutoff valve and a
c.The FlexGas manifold shall be capable of accomplishing the fuel changeover in less than sixty seconds.
R.TruSeal™ Direct Vent
1.The pool heater(s) shall meet safety standards for direct vent equipment as noted by the 2006 UMC, section 1107.6, ASHRAE
2.3SOURCE QUALITY CONTROL
A.The pool heater(s) shall be completely assembled, wired, and
B.The pool heater(s) shall be furnished with the sales order, ASME Manufacturer’s Data Report, inspection sheet, wiring diagram, rating plate and Installation and Operating Manual.
PART 3 - EXECUTION
Project Name / Date | 4 |