Manuals
/
Raypak
/
Household Appliance
/
Boiler
Raypak
manual Wiring Diagram—Models 992B–1262B, SEE PAGE 24 FOR STAGING OPTIONS
Models:
992B
1
50
68
68
Download
68 pages
53.96 Kb
47
48
49
50
51
52
53
54
<
>
Troubleshooting
Install
Wiring Diagram—Models 992B–1262B
Parts Replacement
Warranty
Maintenance
Venting Configurations
Field Wiring Connection
High Limit Manual Reset
UDB Diagnostic Board
Page 50
Image 50
Wiring
Diagram—Models
992B–1262B
SEE PAGE 24 FOR STAGING OPTIONS
50
Page 49
Page 51
Page 50
Image 50
Page 49
Page 51
Contents
INSTALLATION & OPERATING INSTRUCTIONS
Models 992B–2342B Types H, WH & P
Page
CONTENTS
WARNINGS
Pay Attention to These Terms
Product Receipt
BEFORE INSTALLATION
Installations at Elevation
Model Identification
Fig. 1: Component Locations – Back
Component Locations
OPTIONAL FLUE CONNECTION
Fig. 2: Component Locations – Left Side
General Information
GENERAL SAFETY
Time/Temperature Relationships in Scalds
Equipment Base
INSTALLATION
Installation Codes
Stacking
Table D: Vent/Air Inlet Termination Clearances
U.S. Installations1
Canadian Installations2
Outdoor Installations
Clearances
Indoor Installations
Direct Vent
Combustion and Ventilation Air
Reversing Air Filter
Indoor Units
TruSeal Combustion Air
Conventional Combustion Air Supply
U.S. Installations
General
Water Piping
Canadian Installations
Reversing Water Connections
Cold Water Operation
Relief Valve Piping
Hydrostatic Test
Pump Selection
Hydronic Heating
Temperature & Pressure Gauge
Air-Separation/ExpansionTank
Pressure Drop in Feet of Head Feedwater Regulator
Piping
Three-WayValves
Potable Water and Space Heating
Automatic Chlorinators and Chemical Feeders
Winterizing Your Heater
Water Hardness
Gas Supply
Pool/Spa Water Chemistry
pH of Water
Gas Supply Connection
Gas Supply Pressure
Electrical Power Connections
Check the Power Source
Field-ConnectedControllers
Field Wiring Connection
Making the Electrical Connections
DANGER SHOCK HAZARD
Model
Venting
Flue Exhaust Tee
Diameter
Combustion
Support of Vent Stack
Vent Terminal Location
Exhaust
Canadian Installations
Changing the Flue Outlet
U.S. Installations
Natural Draft Vertical Venting Category
Venting Installation Tips
Venting Configurations
Termination
Horizontal Through-the-WallVenting Category
Direct Vent - Horizontal Through- the-Wall
Direct Vent - Vertical
Freeze Protection
Outdoor Installation
Controls
Heater Sequence of Operation
Models 992B-1262B
Color
External Lights
Light
Indication
Models 1532B – 1802B
is safe to operate the heater
Page
Models 2002B – 2342B
Page
69.The heater is now operating at full fire
67.Power is applied to gas valve
66.The stage 4 controller contacts close
Ignition Module
High Limit Manual Reset
Flow Switch
Operating Control
High and Low Gas Pressure Switches
Low Water Cut-OffOptional
UDB Fault History
Pump Time Delay
UDB Diagnostic Board
Venting
87%-EfficiencyBoilers – Special Instructions
Water Piping
Appliance Categories
Condensate Management
Vertical Venting Category
Vent Terminal Location
Common Venting System
70’ of straight flue pipe
•40’ of straight flue pipe
992BE
Wiring Diagram—Models 992B–1262B
SEE PAGE 24 FOR STAGING OPTIONS
Wiring Diagram—Models 1532B–2342B
START-UP
Pre Start-up
Main Burner Adjustment
Start-Up
Blower Adjustment
Follow-Up
Safety Inspection
Leak Test Procedure Dual-SeatGas Valves
Pilot Turn-DownTest
Post Start-UpCheck
To Turn Off Gas To Appliance
OPERATION
Lighting Instructions
TROUBLESHOOTING
Step Step Step Step Step Step Step
Preventive Maintenance Schedule
MAINTENANCE
Suggested Minimum Maintenance Schedule
Semi-Annually
Weekly
Monthly
Annually
APPENDIX
Inside Air Contamination
ADDITIONAL WARRANTY EXCLUSIONS
LIMITED PARTS WARRANTY HI DELTA – TYPES H AND WH
HEAT EXCHANGER WARRANTY
PARTS REPLACEMENT
ADDITIONAL WARRANTY EXCLUSIONS
LIMITED PARTS WARRANTY HI DELTA – TYPE P
HEAT EXCHANGER WARRANTY
PARTS REPLACEMENT
Nominal Factory Recommended Settings
START-UPCHECKLIST FOR FAN-ASSISTED
EMISSIONS SETTINGS AND TEST INFORMATION
RAYPAK PRODUCTS
NOTES
NOTES
NOTES