Raypak HD401, HD101 dimensions PART 3 - EXECUTION, End Of Section

Models: HD101 HD401

1 4
Download 4 pages 39.79 Kb
Page 4
Image 4

PART 3 - EXECUTION

3.1INSTALLATION

A.Must comply with:

1.Local, state, provincial, and national codes, laws, regulations and ordinances

2.National Fuel Gas Code, ANSI Z223.1/NFPA 54 – latest edition

3.National Electrical Code, ANSI/NFPA 70 – latest edition

4.Canada only: CAN/CSA B149 Installation Code and CSA C22.1 CEC Part I

5.Manufacturer’s installation instructions, including required service clearances and venting guidelines

B.Manufacturer’s representative to verify proper and complete installation.

3.2START-UP

A.Shall be performed by Raypak factory-trained personnel.

B.Test during operation and adjust if necessary:

1.Safeties

2.Operating Controls

3.Static and full load gas supply pressures

4.Gas manifold and blower air pressures

C.Submit copy of start-up report to Architect and Engineer.

3.3TRAINING

A.Provide factory-authorized service representative to train maintenance personnel on procedures and schedules related to start-up, shut-down, trouble shooting, servicing, and preventive maintenance.

B.Schedule training at least seven days in advance.

END OF SECTION

Project Name / Date

Division 23 52 33.13 - 4

Page 4
Image 4
Raypak HD401, HD101 dimensions PART 3 - EXECUTION, End Of Section