RedMax BCZ2400S manual Set up, 13 

Models: BCZ2400S

1 36
Download 36 pages 17.51 Kb
Page 13
Image 13
6. Set up

6. Set up

SE1

SE2

SE3

(1)

SE4

SE5

MOUNTING ENGINE (SE1)

1.Push the driveshaft housing toward the clutch housing and rotate it by hand to check that the driveshaft is engaged with the gears.

2.Insert the driveshaft housing into the clutch housing until it bottoms, and align the positioning holes on the clutch housing and the shaft tube and install the screw. When difficult to engage, twist the engine slightly.

3.Fasten the clamp securely with two screws.

13 Manual background IMPORTANT

Tighten the screws gradually by turns.

CONNECTING THROTTLE WIRE

1. Remove the air cleaner cover.

2. Connect the end of the throttle wire to the joint on the top of the carburetor. (SE2)

CONNECTING SWITCH WIRES

Connect the switch wires between the engine and the main unit. Pair the wires of the same color.

INSTALLING HANDLE

Mount the handle to the shaft tube and clamp it at a location that is comfortable to you. (SE3)

(1) About 19 inches (48cm)

INSTALLING DEBRIS GUARD

Put the debris guard on the gear box, attach it with the 2 screws and hardware provided. (SE4)

INSTALLING CUTTING HEAD (SE5)

1.While locking the gear shaft, by inserting the supplied tool into the upper holder on the gear box, loosen and remove the hexagon nut(left- handed)

2.Fit the line head assembly to the gear shaft over the holders. Hand-tighten it securely.

Manual backgroundManual background IMPORTANT

You need not holder (B) and nut when installing the cutting head.

13

Page 13
Image 13
RedMax BCZ2400S manual Set up, 13 