RedMax HEZ2500S manual Set up,  14 , MOUNTING ENGINE SE1, SE2 SE3 SE4, Connecting Throttle Wire

Models: HEZ2500S

1 36
Download 36 pages 36 Kb
Page 14
Image 14
6. Set up

6. Set up

SE1

MOUNTING ENGINE (SE1)

1.Push the driveshaft housing toward the clutch housing and rotate it by hand to check that the driveshaft is engaged with the gears.

2.Insert the driveshaft housing into the clutch housing until it bottoms, and align the positioning holes on the clutch housing and the shaft tube and install the screw. When difficult to engage, twist the engine slightly.

3.Fasten the clamp securely with two screws.

SE2

SE3

SE4

■MOUNTING ENGINE (SE1)SE2 IMPORTANT

Tighten the screws gradually by turns.

CONNECTING THROTTLE WIRE

1. Remove the air cleaner cover.

2. Connect the end of the throttle wire to the joint on the top of the carburetor. (SE2)

CONNECTING SWITCH WIRES

Connect the switch wires between the engine and the main unit. Pair the wires of the same color.

MOUNTING OTHER PARTS

1.Insert the driveshaft into the clutch drum, then attach the gearbox to the shaft tube as aligning the positioning holes. Wipe out grease on the tube and the inside of the gearbox. Screw in the lock screw and fasten the clamp bolt firmly. (SE3)

(1)Clamp bolt

(2)Lock screw

2.Install the blade guard to the gear case with the provided 3 screws, then clamp it to the shaft tube with 2 screws. (SE4)

14

Page 14
Image 14
RedMax HEZ2500S manual Set up,  14 , MOUNTING ENGINE SE1, SE2 SE3 SE4, Connecting Throttle Wire, Connecting Switch Wires