Overall Dimensions & Minimum Clearances
Clearances |
| Operational | Maintenance |
Side | mm | 5 | 5 |
Top | mm | 200 | 200 |
Bottom | mm | 200 | 200 |
Front | mm | 5 | 500 |
3.Installation Requirements Statutory Requirements
The installation should also be in accordance with the relevant recommendations in the current editions of the following British Standards:
BS 7074: Pt 1 | Expansion vessels and ancillary equipment for sealed water systems |
BS 5449 | Forced circulation hot water systems for domestic premises |
BS 7671 | Requirements for Electrical Installations. IEE Wiring Regulations. |
BS 4814 | Expansion Vessels using an internal diaphragm for sealed hot water systems. |
BS 6798 | Installation of gas fired boilers of rated input not exceeding 70 kW Net. |
BS 6759: Pt 1 | Safety valves |
BS 1362 | General purpose fuse links for domestic & similar purposes. (Primarily for use in |
| plugs). |
BS 5376 | Code of Practice for selection & installation of gas space heating |
|
|
Boiler Location
The boiler is not suitable for external installation . The position selected must be within the building unless protected by a suitable enclosure. There must be adequate space for installation, servicing and operation of the boiler as well as adequate air circulation.