Overall Dimensions & Minimum Clearances

Overall Dimensions & Minimum Clearances

Clearances

 

Operational

Maintenance

Side

mm

5

5

Top

mm

200

200

Bottom

mm

200

200

Front

mm

5

500

3.Installation Requirements Statutory Requirements

The installation should also be in accordance with the relevant recommendations in the current editions of the following British Standards:

BS 7074: Pt 1

Expansion vessels and ancillary equipment for sealed water systems

BS 5449

Forced circulation hot water systems for domestic premises

BS 7671

Requirements for Electrical Installations. IEE Wiring Regulations.

BS 4814

Expansion Vessels using an internal diaphragm for sealed hot water systems.

BS 6798

Installation of gas fired boilers of rated input not exceeding 70 kW Net.

BS 6759: Pt 1

Safety valves

BS 1362

General purpose fuse links for domestic & similar purposes. (Primarily for use in

 

plugs).

BS 5376

Code of Practice for selection & installation of gas space heating

 

 

Boiler Location

The boiler is not suitable for external installation . The position selected must be within the building unless protected by a suitable enclosure. There must be adequate space for installation, servicing and operation of the boiler as well as adequate air circulation.