( 21 / 38 )
3.4 Connecting the Target System
There are three ways available to connect this product to target systems as shown in Figure 3.5.
Figure 3.5 Connecting the target system
CAUTION
Notes on Connecting the Target System:
•Always shut OFF power before connecting the target system.
The small connectors of the M302N2T-PRB (J3 and J4) are guaranteed for only 20
insertion/removal iterations.