Rhino Mounts 2408 manual Pre-Operation Inspection and Service

Models: 2408

1 106
Download 106 pages 54.58 Kb
Page 57
Image 57
6. Pre-Operation Inspection and Service
(SL-36)
(SG-21)

OPERATION

6. Pre-Operation Inspection and Service

Periodically inspect all moving parts for wear and replace when necessary with authorized service parts. Look for loose fasteners, worn or broken parts, and leaky or loose fittings. Make sure all pins have cotter pins and washers. Serious injury may occur from not maintaining this machine in good working order.

Never work under the Implement, the framework, or any lifted component unless the Implement is securely supported or blocked up to prevent sudden or inadvertent falling which could cause serious injury or even death.

Before each use, a pre-operation inspection and service of the implement and tractor must be performed. This includes routine maintenance and scheduled lubrication, inspecting that all safety devices are equipped and functional, and performing needed repairs. DO NOT operate the unit if the pre-operation inspection reveals any condition affecting safe operation. Perform repairs and replacement of damaged and missing parts as soon as noticed. By performing a thorough pre-operation inspection and service, valuable down time and repair cost can be avoided. OPS-L-0026

2408 01/11

Operation Section 4-11

© 2011 Alamo Group Inc.

OPERATION

Page 57
Image 57
Rhino Mounts 2408 manual Pre-Operation Inspection and Service