20
5. Check rubber seal is in place on terminal.
*For weather board walls, add spare rubber seal
provided to compensate for weather board angle.
6. Installation of Terminal
From outside, insert terminal into sleeve with the A
mark at the top. Left hand side fixing tie is marked
LEFT (from inside).
7. Attached Ties
Pull hard on left and right hand side ties, clip ties over
lugs inside sleeve. You should be able to pull ties 2 or
3 slots past the starting point. Cut the ties, leaving
about 3/4"(20mm) past the lugs. Bend ties so they
are parallel with the wall.
8. Insert Inner Connection Assembly.
Push assembly into the terminal tube, make sure
TOP mark is uppermost. Fix with 3 screws provided.
9. Manifold can still be turned after attaching.