LOUDSPEAKER SPIKES
In order to realise the full potential of your Caspian
Concrete Floor
If you have a carpeted floor on concrete, the spikes should be used with their pointed end facing downwards, piercing the carpet and making contact with the concrete surface. Adjust the spikes so that the loudspeaker is level with respect to the floor. (horizontally & vertically) Use the supplied spirit level for accurate levelling of the
NOTE:
Please note there are NO items such as electrical
cables, piping etc. immediately under the carpet/floor where the spike positions are.
LOCKNUT |
SPIKE |
CARPET |
CONCRETE |
Carpeted Floor Boards
The procedure for carpeted room with floor boards is the same as for concrete floor. However, a more rigid mounting can be achieved by the following procedure.
After the speaker has been on the carpet for a little while, the spikes would make an impression on the surface of the carpet. By carefully removing the loudspeaker from its position without disturbing the spike impression on the carpet, four
NOTE:
Please note the screws should NOT be too long as these could go through the floor board and cause serious damage to any cable, structure or piping under the floor boards. It is equally important to ensure there are NO other items, electrical cables etc. under the carpet where the spike positions are.
Adjust the spikes and level the speakers as outlined above.
LOCKNUT |
SPIKE |
WOOD SCREW |
CARPET |
FLOOR BOARD |
Roksan Audio ltd | Caspian |
CLASSIFICATION: General Use | Version: 1.07 |
All specifications are liable to change without notice. E&OE | Page 8 of 12 | ENGLISH |