33 Raise the Left Skylight Roof Panel (AN) onto the left side of the shed assembly, the arrows on the Roof Panel should face the inside of the shed and point towards the Ridge Beam Assembly. Using (2) stepstools (1 inside shed, 1 outside shed), lift the bottom of Left Skylight Roof Panel (AN) above horizontal and guide into the Ridge Beam Assembly. Align the lap joint between the Roof Panels. Engage Skylight Left Roof Panel (AN) in the Ridge Beam Assembly by lowering the bottom of the Roof Panel onto the shed assembly (hold Ridge Beam Assembly to prevent twisting).DO NOT SNAP ROOF DOWN.

1

AN

 

3

2

N

2

R

AN

3

R

AN

N

34 Lubricate roof snaps on left side of the back Gable (M) 4 places.

Raise the Left Roof Panel (N) onto the left side of the shed assembly, the arrows on the roof panel should face the inside of the shed and point towards the Ridge Beam Assembly.

Using (2) stepstools (1 inside shed, 1 outside shed), lift the bottom of the roof panel above horizontal and guide into the Ridge Beam Assembly. Align the back Gable (M) rib with the channel in the Left Roof Panel (N). Engage Left Roof Panel (N) in Ridge Beam Assembly by lowering the bottom of the Roof Panel onto the shed assembly (hold Ridge Beam Assembly to prevent twisting).

DO NOT SNAP ROOF DOWN.

1

Channel

Roof Panel

N

2

 

M

3

AN

2

R

N

3

R

3

Gable

Rib

Page 12
Image 12
Rubbermaid 1S84 manual Channel Roof Panel Gable Rib