d. Install Left Door (L) and Right Door (K) into hinge openings of Front Floor (A) and hinge sockets in Front Roof (J).

Note: Only raise front edge of roof enough to install the door hinge pins.

JJ

L

K

L

K

AA

e. From inside the shed, install four Screws (AA) into the roof, two on each side wall.

Note: The screws also have to go through the Roof Brace (RB) at each end to properly secure the roof!

A second person on the outside of the shed should hold down the edge of the roof firmly at each screw location.

AA (4)

RB

J

5.0 Finishing Installation

a.

 

Install Screws (AA) into 6 locations shown at bottom of wall panels to secure walls to floor.

AA (6)

 

HELPFUL HINT: Pilot holes may be drilled for the screws.

CAUTION: Do not overtighten screws.

Page 11
Image 11
Rubbermaid 5L10 instruction manual Finishing Installation