Samsung AW09LH Series Setting Up The Air Conditiner, installing your air conditioner

Models: AW09LH Series AW07LH Series

1 24
Download 24 pages 3.06 Kb
Page 23
Image 23
SETTING UP THE AIR CONDITINER

installing your air conditioner

SETTING UP THE AIR CONDITINER

The air conditioner must be installed horizontally or tilted slightly to the outside for proper water drainage.

Assembly for drainage

Once a location has been selected for installation, proper drainage should be established. If the drain tube and/or drain hose are not provided, call your nearest contact center.

1.Attach the gasket 1 and the drain tube 2 to the base pan hole 3 in the rear side of the unit with screws 4

 

4

1

REAR SIDE

 

3

 

2

2.Connect the Rubber Cap 5 to the drain tube hole.

5

On exceptionally hot and humid days the air conditioner may overflow condensed water. In hot and high humidity zones, make sure the Rubber Cap have been removed .

installing _23

Page 23
Image 23
Samsung AW09LH Series, AW07LH Series user manual Setting Up The Air Conditiner, installing your air conditioner