3-WIRE system connections

1.Loosen or remove the center terminal block screw.

2.Connect the neutral wire (white or center wire) of the power cord to the center, silver-colored terminal screw of the terminal block. Tighten screw.

3.Connect the other wires to outer terminal block screws. Tighten screws.

4.Tighten the strain relief screws.

5.Insert the tab of the terminal block cover into your Dryer’s rear panel slot.

Secure the cover with a hold-down screw.

1. External ground connector 2. Neutral grounding wire (green/yellow)

3. Center silver-colored terminal block screw 4. Neutral wire (white or center wire)

5. 3/4” (1.9 cm) UL-listed strain relief

If converting from a 4-wire electrical system to a 3-wire, the ground strap must be WARNING reconnected to the terminal block support to ground the Dryer frame to the neutral

conductor.

4-WIRE system connections

1.Remove the center terminal block screw.

2.Connect the ground wire (green or unwrapped) of the power cord to the external ground conductor screw.

3.Connect the neutral wire (white or center wire) of the power cord and the appliance ground wire (green with yellow stripes) under the central screw of the terminal block.

4.Connect the other wires to the outer terminal block screws. Tighten screws.

5.Tighten the strain relief screws.

6.Insert the tab of the terminal block cover into your Dryer’s rear panel slot. Secure the cover with a hold-down screw.

1. External ground connector

2. Green or bare copper wire of power cord

3. 3/4 in. (1.9 cm) UL-listed strain relief

4. Center silver-colored terminal block screw

5. Grounding wire (green/yellow)

6.Neutral wire (white or center wire)

7.With a level, check your Dryer and make necessary adjustments to the leveling legs.

8.At this time, make sure all gas connections (on gas models), exhaust and electrical connections are complete. Plug in your Dryer, and check operation by using the checklist below.

9.(GAS MODELS ONLY : DV210AG*, DV220AG*)

The burner may not ignite initially due to air in the gas line. Allowing your Dryer to operate on a heat setting will purge the line. If the gas does not ignite within 5 minutes, turn your Dryer off and wait 5 minutes. Be sure the gas supply to your Dryer has been turned on. In order to confirm gas ignition, check the exhaust for heat.

FINAL INSTALLATION CHECKLIST

Dryer is plugged into an electrical outlet and is properly grounded.

Exhaust ductwork is hooked up and joints are taped.

Plastic flexible duct is NOT used.

Used rigid or stiff-walled flexible metal vent material.

Dryer is leveled and is sitting firmly on the floor.

Gas models – gas is turned on with no gas leaks.

Start your dryer to confirm that it runs, heats, and shuts off.

installing your dryer _17

01 installing your dryer

DV220AE-02810A-03_EN.indd 17

2010-06-28 ¿ÀÈÄ 5:53:32

Page 17
Image 17
Samsung DV210AG*, DV220AG*, DV220AE*, DV210AE* user manual Final Installation Checklist, Wire system connections, Conductor