Step-by-step installation
STEP 1 Select a location
Location requirements:
• Solid, level surface without carpeting or flooring that may obstruct ventilation
•Away from direct sunlight
•Adequate room for ventilation and wiring
•The ambient temperature is always higher than the freezing point (0 ˚C)
•Away from a heat source
STEP 2 Remove the shipping bolts
Unpack the product package and remove all shipping bolts.
1. Loosen all shipping bolts on the rear of the machine using the supplied spanner.
2. Fill the holes with the supplied plastic bolt caps.
Keep the shipping bolts for future use.
WARNING
Packaging materials can be dangerous to children. Dispose all packaging material (plastic bags, polystyrene, etc.) out of children’s reach.
Installation
English 19
2017/2/23 15:59:36