Drill a 80 mm hole, insert a PVC pipe. (fig.
Remove the return air grille releasing it from the side guides |
| |
and the central elastic stop. (fig. | 5 - 10 mm | |
| ||
Open a | Fig. | |
outside).(fig. | ||
| ||
Floor installation. |
| |
Predispose the fixing of the bracket. |
| |
Check if the quantity and the rawl plugs type supplied are |
| |
the proper ones for fixing the unit on the wall. |
| |
Attach the bracket to the wall with the screws, but do not |
| |
tighten the screws all the way, so that you can move the |
| |
bracket for final adjustment. Adjust the bracket as shown in |
| |
the figure, then finish tightening the screws. Hang the unit | Fig. | |
on the bracket as shown in the figure. (fig. | ||
| ||
Wall installation. |
| |
Use rawl plugs suitable to the wall consistence and four threaded |
| |
bars of suitable length. (not supplied). (fig. |
| |
Under ceiling installation. |
| |
Use rawl plugs suitable to the wall consistence and four threaded | Fig. | |
bars of suitable length. (not supplied). |
| |
Open a |
| |
ton panel) and the condensate drain hole. Fix the unit under |
| |
the ceiling. (fig. |
| |
Predispose the condensate drain pipe with a positive slope |
| |
to the outside. Cut the angle of the return air grille as |
| |
marked on the internal side. (fig. |
| |
Remove the side panel to operate on the connecting pipes. |
| |
Predispose the condensate drain pipe and attach it to the | ø 5 | |
fan housing if necessary. (fig. |
| |
Install the condensate drain to the outside with a positive |
| |
slope. (fig. | Fig. | |
Fix both side panels and reassemble the return air grille. | ||
| ||
(fig. |
|
20 - 40 mm
35 - 45 mm
Fig. 3-10
5 - 10 mm
Fig.
Fig.
Fig. 3-13
Fig.
Fig.
7