8.Install the blower assembly to the mounting bracket and secure with the mounting pin and hair pin. See Figure 3-5, Page 4.

9.Align the blower assembly with the discharge opening of the cutter deck. Tighten the hardware for the mounting bracket. Install the quick pin through the rear hole in the discharge chute mounting bracket. See Figure

3-5, Page 4.

10.Install the new belt cover from the cutter deck to the blower mounting bracket and secure with the original belt cover plastic wing nuts.

11.Install the belt to the spindle pulley. When replacing the belt, see figure below.

BACK SIDE

IDLER PULLEY BLOWER

PULLEY

FRONT SIDE

SPINDLE

PULLEY

IDLER PULLEY

 

12.Install the plastic belt cover and secure with the plastic wing nuts. See Page 12 of the Illustrated Parts List for proper installation.

52" Cutter Deck

LIFT LINK

SPACER

BOLT, 3/8-16 x 1-1/4"

NUT

BELL CRANK

NUT

BOLT, 3/8-16 x 1-1/2"

WASHER

SPACER

REAR OF CUTTER DECK

CUTTER DECK

DISCHARGE CHUTE OPENING

FRONT OF

CUTTER DECK

 

VIEW FROM RIGHT SIDE

 

OF CUTTER DECK

Figure 2-52"GC-STT install art

FIGURE 3-3

3

Page 5
Image 5
Scag Power Equipment GC-STT-V operating instructions Cutter Deck