Scag Power Equipment STWC operating instructions Custom-Cut Baffle

Models: STWC

1 110
Download 110 pages 9.34 Kb
Page 31
Image 31

Section 6

To adjust the Custom-Cut Baffle height:

1.Place the cutter deck in the transport position.

2.Remove the hardware securing the Custom-Cut Baffle to the cutter deck. (See Figure 6.7).

-NOTE-

Hardware location used in the illustrations are for reference only. Location of hardware may vary depending on cutter deck size.

MOUNTING

MOUNTING

HARDWARE

HARDWARE

 

2004 CCB

Figure 6-7. Custom-Cut Baffle

MIDDLE SET OF HOLES

CARRIAGE BOLT

FOR 3-1/2" SETTING

 

 

 

2004 CCB - 3-1/2" Setting

FLATWASHER

ELASTIC STOP

 

 

 

 

NUT

Figure 6-9. 3-1/2" Custom-Cut Baffle Position

 

 

 

BOTTOM SET OF HOLES

 

 

 

CARRIAGE BOLT

 

FOR 4" SETTING

 

 

 

 

 

 

2004 CCB - 4" Setting

FLATWASHER

ELASTIC STOP

 

 

NUT

Figure 6-10. 4" Custom-Cut Baffle Position

3.Move the Custom-Cut Baffle to desired position. (See Figures 6.9 through 6.11 for position).

4.Reinstall the mounting hardware as shown. (See Figures 6.10 though 6.11). Torque hardware to 39ft- lbs.

TOP SET OF HOLES

CARRIAGE BOLT

FOR 3" SETTING

 

 

2004 CCB - 3" Setting

FLATWASHER

ELASTIC STOP

 

 

NUT

Figure 6-8. 3" Custom-Cut Baffle Position

27

Page 31
Image 31
Scag Power Equipment STWC operating instructions Custom-Cut Baffle