Schumacher SE-1250 Meter Functions, Percent Of Charge, The Ammeter, See Meter Views, 2 amp

Models: SE-1010-2, SE-1012D, SE-1052, SE-1250

1 8
Download 8 pages 58.46 Kb
Page 4
Image 4
METER FUNCTIONS

G.

METER FUNCTIONS

 

 

PERCENT OF CHARGE

The percent of charge scale is intended as a visual aid to help simplify detemmining the state of charge. It is scaled for use with the 6 or 10 amp charge rates only. For the 2 amp charge rate, use the red triangle.The percent of charge is based on current draw by the battery. For this reason accuracy will vary with the size and battery type. Typically a 28 ampere hour bat- tery will draw less current at end charge than a 140 ampere hour wet cell battery. This means that the indication for a fully charged large battery may be slightly less than 100%.

For the 2 amp charge rate a red triangle has been provided within the green area of the meter scale. It’s accuracy has been calibrated for use with small battery. As a battery takes on a charge, correspondingly less of the red area will fall under the meter needle.

The Ammeter

The ammeter indicates the amp draw on the charger when a fully discharged battery is con- nected to the charger. The meter will read the maximum output rating of the charger 2 amps, 10 amps, or 30 amps depending on the charger and switch position you have chosen.

The charge on the 2 amp or the 10 amp, will gradually taper down as the battery nears full charge. As the charge current tapers, the ammeter needle will also move down. The 2 amp charge produces such a small current that it will not show up very well on the meter.

The 50 amp boost charge (on the SE-1250 only) may be used for a quick charge prior to using the engine start feature. The meter will indicate around the 30 amps line if the battery is fully discharged and less if the battery is partially charged. Follow duty cycle instructions for this boost position.

See Meter Views

The charger meter needle will indicate somewhere between the solid line and the dotted line when the charging is first started. The variation is due to the difference in battery conditions and construction of the battery. A battery that is not fully charged will not require the charger to begin the charge at the highest rating, such as the 10 amp on the 10 amp charge position. The battery is charged when the meter indicates near the dotted line shown in the view at the right. This is about 1/2 of the selected charge rate. (about 4-5 amps on the 10 amp setting).

2 amp

 

DC AMPS

 

 

 

2 AMP RATE

 

 

 

CHARGE %

 

100

75

50

25

0

2

4

6

8

10

12

10 amp

 

 

DC AMPS

 

 

 

2 AMP RATE

 

 

 

CHARGE %

100

75

50

25

0

2

4

6

8

10

12

50 amp Engine Start

 

 

DC AMPS

 

CHARGING

 

START

0

5

10

15

20

25

30

4

Page 4
Image 4
Schumacher SE-1250 Meter Functions, Percent Of Charge, The Ammeter, See Meter Views, 2 amp, Dc Amps, 10 amp, Charging