Assembly Stage #3
Attach Front Stabilizer Tube and Pedals to Main Unit
Assembly Hardware Required: | (2) M8 Bolt 75mm long (item #16) | |
| (2) | Curved Washers (item #19) |
| (2) | Acorn Nut(item #20) |
Step 8: Attach FRONT STABILIZER TUBE (#17) to the MAIN UNIT (#31) with the M8 BOLT 75mm (#16), CURVED WASHER (#19), and ACORN NUT (#20). Tighten Bolts with provided wrench.
Step 9: Attach RIGHT PEDAL (#21) to the right crank arm on the MAIN UNIT (#31). Thread the pedal onto the crank arm and then tighten with pedal wrench. Attach LEFT PEDAL (#21) to the left crank arm on the MAIN UNIT (#31). Thread the pedal onto the crank arm and then tighten with pedal wrench. Note: There is a right pedal and a left pedal, marked by R and L. The threading on the left pedal is reversed from the right pedal. Counterclockwise rotation tightens while Clockwise rotation loosens on the left pedal. To avoid stripping of the threads be careful to use the proper pedal.
Attach PEDAL STRAPS (#18) to each PEDAL (#21). Again, each strap is labeled with an R or an L corresponding to the right and left pedal straps.