Elite 9 Installation Guide, Rev. B | 17 |
1Measured with an average reading DC ammeter. Instan- taneous +12V current peaks will exceed these values.
2A −10% tolerance is permissible during initial start of the spindle but must return to ±5% before reaching 5,400 RPM. The ±5% must be maintained after the drive signifies that its
3See the +12V current profile in the Elite 9 Product Manual.
4This condition occurs when the Motor Start option is en- abled and the drive has not yet received a start motor command.
5See “Conducted noise immunity” in the Elite 9 Product Manual. The specified voltage tolerance includes ripple, noise, and transient response.
6At
7Minimum current loading for each supply voltage is not less than 7% of the maximum operating current shown.
8Use separate ground returns for +5V and +12V supplies.
9Where power is provided to multiple drives from a common supply, carefully consider individual drive power require- ments. Where multiple units are powered on simultaneously, be sure the peak starting current is available to each device.
10Operating condition is a third stroke seek at OD and read one track. A command is issued every 100 msec.
11No terminator power. See Section 11.7.3.4 in the Elite 9 Product Manual.
continued