SANITATION SYSTEM LAYOUT
SYSTEM GUIDELINES
1.Cassette vacuum tank must be used with VacuFlush toilet.
2.VacuFlush toilet must be connected to pressurized water supply (not shown).
3.Centerline of toilet base must be 11 inches (279 mm) from back wall.
4.
INSTALLATION
DOCKING PLATFORM RISER
1. The riser section of the docking platform is |
| The riser and base sections |
mounted on a level floor using four screws (not |
| must be assembled on the |
supplied). The floor must be strong enough | ATTENTION | same level surface. |
to support the weight of the cassette when full |
| |
(about 40 lbs. – 18 kg). |
|
|
BACKFRONT
DOCKING PLATFORM BASE
1.The base section of the docking platform is at- tached to the riser. The base has two tabs (A) that must be pushed into the respective slots in the rear wall of the riser. Make sure that the connection (B) for the carbon filter fits into the space provided.
2.The ventilation hose (C) is routed out the side of the base. Using barbed hose adapter provided, route reinforced
3.Fasten the base of the docking platform to the surface (D).
Make sure that the carbon filter fits into the space provided (B) and is properly connected at both ends.
A | B | A |
| C | |
|
|
D
3