![](/images/new-backgrounds/1026406/2640629x1.webp)
Installation Step 3
Attach the T-rail to the Header Bracket
--Header WalI
Header
Bracket
Cable
Putley
Bracket
Door
•Position the opener on the garage floor below the header bracket. Use packing material as a protective base.
If the door spring is in the way you'll need help.
Have someone hold the opener securely on a temporary support to allow the
•Position the cable pulley bracket against the header bracket.
•Align the bracket holes and join with a clevis pin as shown.
•Insert a ring fastener to secure.
Ring Fastener
Header Bracket 0
i
C_
| \\ | I |
Ctevis Pin |
|
|
Cable |
| |
|
| |
| Pulley |
|
| Bracket |
|
Temporary
Support
Hardware Shown Actual Size | O |
°1 | |
Clevis Pin |
|
Ring Fastener |
15