ASS | LY / P |
INSTALL AUGER CONTROL ROD (See Figs. 5 and 6)
1.Retrieve vinyl sleeve and spring from bag of parts and retrieve the auger control rod from carton chute tray. Slide straight rod end through the small hole in the vinyl sleeve. Hook spring in hole in rod end.
2.Hook end of spring into control arm with loop opening up as shown. (See Fig. 5)
3.With top end of rod positioned under right side of control panel, push down on rod and insert end of rod into hole in auger control bracket. Secure with retainer spring.
E-OPERATIC
INSTALL DISCHARGE CHUTE / CHUTE ROTATER
HEAD (See Fig. 7)
NOTE: The
1.Place discharge chute assembly on top of chute base with discharge opening toward front of snow thrower.
2.Position chute rotater head over chute bracket. If neces-
sary, rotate chute assembly to align square and pin on un- derside of chute rotater head with holes in chute bracket.
3.With chute rotater head and chute bracket aligned, position chute rotater head on pin and threaded stud of mounting bracket.
4.Install 3/8 washer and Iocknut on threaded stud and tighten securely.
AUGER
ROD
\
CONTROL
ARM
FIG. 5
AUGER CONTROL ROD AUGER CONTROL
RETAINER LEVER
SPRING\
CONTROL
BRACKET
CHUTE
ROTATER_3/8LOCKNUT
HEAD
_3/8WASHER
PIN
STUD
ROTATER HEAD
MOUNTING
BRACKET
FIG. 7
FIG. 6