PTC
Poor starting or no operating of the Compressor.
First, separate the PTC from the Compressor and check the
4D voltage between NO 5 and 6 in the PTC with a muititester or
Wheatstone Bridge.
F
Normal | _ | Check another |
|
| electric |
|
| components. |
__ | Abnormal | _ | PTC. |
Replace the |
_{_ | Abnormal | _ | PTC. |
Replace the |
Separate the OLP from the Compressor and
4m check resistance value between two terminals of OLP with Tester.