Servis-Rhino 2410 manual Operation

Models: 2410

1 108
Download 108 pages 3.35 Kb
Page 79
Image 79

OPERATION

Another method for large dirt piles is to build a ramp approach to the pile.

It is important to keep the bucket level when approaching a bank or pile. This will help prevent gouging the work area.

2410 02/10

Operation Section 4-31

© 2010 Alamo Group Inc.

OPERATION

Page 79
Image 79
Servis-Rhino 2410 manual Operation