ASSEMBLY

SHEAR BOLT or SLIP CLUTCH DRIVELINE INSTALLATION

Attach rear driveline of U-Joint to input shaft on gearbox, install snap ring in groove on input shaft. NOTE: Check that Snap Ring is properly seated in groove. This snap ring retains driveline when shear bolt shears. Install Grad 2 (Only) shear bolt 1/2” x 2-3/4”. Use of a stronger shear bolt other than Grade 2, will result in driveline failure and will void warranty. Figure AsmP-R-0043

Front Deflectors and Rear Metal Band (Standard Equipment)

Front rubber-fabric Deflectors are Standard Equipment. Guard must be installed (and maintained in good repair) except for agricultural purposes only in areas where persons, vehicles, livestock, or other property will not be endangered by thrown objects and where such safety equipment would prevent the mower's reasonable performance of its assigned agricultural task. Assy02-Shielding

Deflectors: Front Deflectors (Standard Equipment) are recommended for the average user and will provide protection from thrown objects with proper operation under normal conditions. Deflectors must be maintained in good repair or replaced after no more than two inches of wear off lower edge.

EC72 03/08

Assembly Section 3-5

© 2008 Alamo Group Inc.

ASSEMBLY

Page 83
Image 83
Servis-Rhino EC72 manual Shear Bolt or Slip Clutch Driveline Installation