Type | Installation |
Pavement Recess and Wireways Preparation (contd.)
∙Make sure the recess size and depth are maintained within specified limits.
∙The recess side walls must be perpendicular to the pavement surface.
∙The bottom surface must be flat or slightly concave to ensure that the base receptacle is resting securely and in true position.
∙The recess can best be drilled using a
Wireways Preparation
To prepare wireways, follow the guidelines below.
∙See Figure 3. The wireways should be sawed using a
∙When the wireways cross construction joints, the sawcuts should extend
∙Fill to 1 in. (25.4 mm) from the top of the pavement with an appropriate joint sealing filler in accordance with Item
Installation on L-868B Base
The light assembly is shipped complete, including the lamp, and is ready for installation.
To install the
1.Clean the base receptacle. Make sure that the base receptacle does not contain water and is completely clean and dry. The mating surfaces must be clean and free of foreign particles.
2.Slide a
3.Place the light assembly beside the opening in the