Manuals
/
Slant/Fin
/
Household Appliance
/
Boiler
Slant/Fin
Oil-fired Boiler dimensions
Models:
Oil-fired Boiler
1
22
24
24
Download
24 pages
61.79 Kb
17
18
19
20
21
22
23
24
<
>
Install
Replacement Of Steam Boilers
Maintenance
Wiring The Boiler
MODEL F-10 ELECTRODE SETTING
Cleaning Piping System
Safety
Page 22
Image 22
✍
Page 21
Page 23
Page 22
Image 22
Page 21
Page 23
Contents
INTREPID
INSTALLATION AND OPERATING INSTRUCTIONS
SAFETY WARNING
OIL-FIREDWATER AND STEAM BOILERS/NO. 2 OIL
INTREPID
BOILER LOCATION
INSTALLATION REQUIREMENTS
INTREPID
MINIMUM CLEARANCE
INTREPID
Boiler Location
Figure 3b
INTREPID
Figure 3a
Figure 3c
CLEANING PIPING SYSTEM
INSTALLING CONTROLS AND
ACCESSORIES ON BOILER UNITS
INTREPID
INTREPID
INSTALLING THE BURNER
WIRING THE BOILER
PIPING TANKLESS HEATER if used
INTREPID
OPERATING INSTRUCTIONS
CLEANING AND FILLING A NEW WATER BOILER
VENT PIPING AND DRAFT REGULATOR
BLOWING OFF A LOW PRESSURE STEAM BOILER
CLEANING AND FILLING A NEW STEAM BOILER
INTREPID
LOW WATER CUT-OFF CHECK-OUT
INTREPID
REPLACEMENT OF STEAM BOILERS
PRESSURE CONTROL CHECK-OUT
INTREPID
BASIC MODULE WIRING less circulator
INTREPID
orHydrolevelCycleGard450 L.W.C.O
WIRING FOR PACKAGED STEAM BOILER
BOILER WIRING DIAGRAM FOR RIELLO
INTREPID
LINE VOLTAGE WALL THERMOSTAT BY OTHERS
WALL THERMOSTAT BY OTHERS
INTREPID
INTREPID
INTREPID
Nozzles
INTREPID
SETTING THE AIR ADJUSTMENT PLATE See figure
BURNER DATA – RIELLO continued
MODEL F-10 ELECTRODE SETTING
NOTE ELECTRODES ARE PRESET AT THE FACTORY
INTREPID
INTREPID
CARE AND MAINTENANCE
INTREPID
Page