Slant/Fin operating instructions HOT WATER MODELS VSPH-60 THROUGH VSPH-180, Victory Vsph

Models: VSPH-180 VSPH-60

1 28
Download 28 pages 39.42 Kb
Page 1
Image 1
VICTORY VSPH

VICTORY VSPH

®

This manual must be left with owner and should be hung on or adjacent to the boiler for reference.

DIRECT-VENT SEALED COMBUSTION BOILERS

HOT WATER MODELS VSPH-60 THROUGH VSPH-180

GAS-FIRED CAST-IRON BOILERS FOR NATURAL AND L.P. PROPANE GASES

INSTALLATION AND OPERATING INSTRUCTIONS

TABLE OF CONTENTS

 

Dimensions, Rating and Orifice Sizes

2

Identification of Parts

3

Installation Requirements

4

Venting Application

5

Boiler Room Air Supply and Ventilation

5

Flue gas Venting Requirements

5

Vent Material

5

Air Intake Material

6

Flue and Air Intake Restrictions

6

Non-Direct Vent Installation

8

Sidewall Venting, Non-Direct Vent

8

Vent Termination Location and Clearance

8

Non-Direct Vent Vertical Venting

8

Direct Vent Installation

8

Sidewall Venting, Direct Vent

8

Vent/Air Intake Termination Installation

8

Direct Vent, Venting and Air Intake through a Roof

13

Venting and Air Intake Regular Inspection

15

Gas Piping

15

Electrical Wiring

15

Multi Zoning

18

Water Piping

18

Wiring Diagram

16

Operating Instructions

19

Gas Input Rate Adjustment

20

Boiler Control

22

Sequence of Operation

21

Status of Indicator Lights (LED’s)

22

Safety Check

23

Care and Maintenance

24

General Troubleshooting Guide

25-27

WARNING

The venting system of this boiler is under positive pres- sure. Leakage from this system can be hazardous and if not avoided can result in death or serious injury. In addi- tion to the recommendations within this manual and the User’s Information Manual, the venting system, from the blower to the outdoor discharge, must be carefully checked annually by a qualified service agency.

IMPORTANT

READ ALL OF THE FOLLOWING WARNINGS AND STATEMENTS BEFORE READING THE INSTALLATION INSTRUCTIONS

WARNING

LIQUEFIED PETROLEUM (L.P.)

PROPANE GAS-FIRED BOILERS

Installation location ONLY as permitted in paragraph entitled "LIQUEFIED PETROLEUM (L.P.) PROPANE GAS-FIRED BOILER LOCATION" on page 4 of this instruction book.

The above warning does not apply to NATURAL gas- fired boilers.

The installation must conform to the requirements of the authority having jurisdiction or, in the absence of such requirements, to the National Fuel Gas Code, ANSI Z223.1-latest edition. The installation must also conform to the additional requirements in this Slant/Fin Instruction Book.

In addition where required by the authority having juris- diction, the installation must conform to American Society of Mechanical Engineers Safety Code for Controls and Safety Devices for Automatically Fired Boilers, No. CSD-1.

WARNING

This boiler, gas piping and accessories must be installed, connected, serviced and repaired by a trained, experienced service technician, familiar with all precautions required for gas-fired equipment and licensed or otherwise qualified, in compliance with the authority having jurisdiction.

Heating Contractor
Boiler Model Number
Address
Boiler Serial Number
Phone Number
Installation Date
Printed in U.S.A. 207
Part No. 455035 Publication No. VSPH-40 Rev. A
Page 1
Image 1
Slant/Fin operating instructions HOT WATER MODELS VSPH-60 THROUGH VSPH-180, Victory Vsph, Table Of Contents, Address