Slant/Fin VSPH-180 Vsph Boiler Sequence Of Operation, VICTORY VSPH Models, Inducer Blower On

Models: VSPH-180 VSPH-60

1 28
Download 28 pages 39.42 Kb
Page 21
Image 21
VSPH BOILER SEQUENCE OF OPERATION

VICTORY VSPH Models

21

 

 

 

VSPH BOILER SEQUENCE OF OPERATION

THERMOSTAT CALLS FOR HEAT

CIRCULATOR ON

NO BOILER WATER TEMPERATURE IS

BELOW HIGH LIMIT SETTING?

YES

PRESSURE SWITCH CONTACTS PROVED

NO

 

 

 

 

OPEN WITHIN 45 SECONDS?

 

 

 

 

 

YES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

INDUCER (BLOWER) ON

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONTROL LOCKOUT.

POWER AND

PRESSURE

SWITCH LED’S

FLASHING.

1 HOUR WAIT

PERIOD.

4 TIMES RE-TRIALS

FOR IGNITION

CONTROL RE-INSTATE TRIAL FOR IGNITION WITH 30 SECONDS INTER-PURGE

PILOT LIGHTS AND YES FLAME SENSED?

NO

CONTROL LOCKOUT

FLAME LED FLASHING. 1/2 HOUR WAIT PERIOD

PRESSURE SWITCH CONTACTS CLOSED

NO

 

WITHIN 5 MINUTES?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

YES

 

 

 

 

 

 

 

 

 

30 SECONDS PRE-PURGE PERIOD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TRIAL FOR IGNITION-15 SECONDS

PILOT VALVE OPENS. IGNITION SPARK STARTS.

NO

PILOT LIGHTS AND FLAME IS SENSED

 

DURING TRIAL FOR IGNITION?

 

 

YES

 

 

SPARK OFF. MAIN VALVE OPENS. BOILER HEATING PERIOD

STARTS

CONTROL CONTINUOUSLY MONITORS THERMOSTAT, HIGH

LIMIT, PRESSURE SWITCH AND FLAME SENSOR.

THERMOSTAT CALLS FOR HEAT ENDS.

CIRCULATOR OFF, PILOT AND MAIN VALVE CLOSE.

15 SECONDS POST PURGE

BOILER WAITS FOR NEXT CALL FOR HEAT.

Page 21
Image 21
Slant/Fin VSPH-180, VSPH-60 operating instructions Vsph Boiler Sequence Of Operation, VICTORY VSPH Models, Inducer Blower On