User instructions

"3/1" OPTION BUTTON (on some models only) (available in all programs except the soak program)

By pressing the button (4) you activate the "3/1" option, confirmed when the relative light comes on. This option has been studied for the use of dishwashing powder or tablets with integrated substances in place of regenerating salt or rinse-aid known on the market as “3 in 1” or “triple action” products; in this case the dishwasher will use the product in an optimal way avoiding salt and rinse-aid consumption, which could already be found in the dishwasher.

Note: When selecting the " 3/1" button, it is normal that the salt and rinse-aid lights remain on, if their containers are empty.

DELAY PROGRAM (on some models only) (available in all programs except the soak program)

The PROGRAM DELAY button (3) can be pressed to delay the start of the washing program by 3, 6 or 9 hours. This function allows you to set the dishwasher to work at your preferred time of day.

After selecting the delay, start the program (see relative section).

The appliance will prewash the dishes, after which the "program delay" set previously will come into effect (the light corresponding to 3, 6 or 9 hours flashes).

To reset or change the delay once the program has started:

￿press the START/PAUSE button (5) for a few seconds, until the PHASES/PROGRAM lights (10) come on;

￿press the DELAY PROGRAM button (3) several times “until the program delay” returns to zero (all the lights indicating the delay go out);

￿press the START/PAUSE button (5) to start the new program.

22

Page 9
Image 9
Smeg DD612S7 manual User instructions