Smith Cast Iron Boilers Table Of Contents, 19A SERIES BOILER INSTALLATION INSTRUCTIONS

Models: 19A SERIES

1 12
Download 12 pages 8.96 Kb
Page 3
Image 3
TABLE OF CONTENTS

PAGE 3

19A SERIES BOILER

INSTALLATION INSTRUCTIONS

TABLE OF CONTENTS

SECTION

DESCRIPTION

PAGE

 

SECTION

DESCRIPTION

PAGE

 

 

 

 

 

 

 

 

19A SERIES ISOMETRIC DRAWING

2

 

10

TANKLESS HEATERS

6

 

PARTS LIST

2

 

11

SMOKEHOOD

6

 

TABLE OF CONTENTS

3

 

12

BURNER MOUNTING PLATE

7

1

GENERAL INFORMATION

3

 

13

CLEANOUT COVERS

8

2

BOILER LOCATION

3

 

14

REAR OBSERVATION PORT

8

3

CODES AND REGULATIONS

3

 

15

CONTROL LOCATIONS

8

4

CHIMNEY AND BREECHING

3

 

16

JACKET

8

5

COMBUSTION AND VENTILATION AIR

4

 

17

SAFETY AND RELIEF VALVES

8

6

ASSEMBLY OF SECTIONS

4

 

18

CLEANING BOILER WATERWAYS

9

7

HYDROSTATIC TEST

5

 

19

OWNER'S INSTRUCTIONS

9

8

STEAM PIPING

5

 

 

CONTROL TAPPINGS DIAGRAM

10

9

WATER PIPING

6

 

 

WARNING

11

1.GENERAL

19A Series boilers are wet-base, extended surface, vertical flue design with integral cast flue gas collector for pressurized firing with oil, gas or combination power burners. Upper and lower port hydronic seals are of a special material resistant to petroleum products and compatible with ethylene and propylene based anti-freeze (non automotive type) which does not contain corrosion inhibitors to protect aluminum. The flue gas joints between sections, etc. are sealed using high temperature (2300° F) ceramic fiber rope. Access to the heating surface for cleaning is provided from the left hand side of the boiler through large cast iron cover plates. A slide damper is provided in the flue gas outlet for back pressure adjustment.

The boilers are supplied completely knocked down for field assembly, as factory assembled blocks of sections or completely assembled boiler-burner units. All items should be inspected for damage upon receipt, and any damage reported to the wholesaler and trucker. All components should be stored in a clean, dry area.

The boilers are conservatively rated for high efficiency performance with capability for down-firing to match connected load. The large OBROUND upper port provides transfer area above the water surface for dry steaming at full load.

2.BOILER LOCATION

The boiler must be installed on a smooth, level, non- combustible floor or pad as close to the chimney or vent location as possible to minimize breeching length. Allow clearance around the boiler for piping, service, maintenance, cleaning and tankless coil removal. Approximately 30 inches on the sides is a minimum (Check local code requirements). Do not install electrical conductors in floor or pad under boilers.

See FIGURE 1 for boiler floor pad requirements, and TABLE 1 for minimum required pad length.

 

TABLE 1

Boiler No.

Min. Recommended Pad Length

19-*-3

30"

19-*-4

36"

19-*-5

42"

19-*-6

48"

19-*-7

54"

19-*-8

60"

19-*-9

66"

19-*-10

72"

19-*-11

78"

19-*-12

84"

 

 

3.CODES AND REGULATIONS

All work in connection with the boiler, burner and controls must be performed in strict accordance with requirements of state and local authorities having jurisdiction over boiler installations.

 

 

32"

 

 

JACKET SIDE PANEL

 

 

FLOOR

C OF BOILER

 

 

L

 

 

OR PAD

 

 

 

1 1/2" x 2 1/2" ANGLES

 

4 5/32"

12 27/32"

12 27/32"

4 5/32"

 

 

25 21/32"

 

 

 

34"

 

FIGURE 1

In the absence of such local requirements, the following should govern:

A.S.M.E. Section IV - “Heating Boilers"

A.S.M.E. Section VI - “Care and Operation of Boilers” ANSI/NFPA 31 - “Installation of Oil Burning Equipment” ANSI/Z223.1 - “National Fuel Gas Code” ANSI/NFPA 70 - “National Electrical Code”

4.CHIMNEY AND BREECHING

The breeching connection between boiler and chimney should be as direct as possible with the minimum number of elbows or bends. It should pitch upwards to the chimney at a rate of 1/4 inch per foot of horizontal run. Generally, the breeching and chimney should be the same diameter as the boiler outlet connection.

NOTE

11 and 12 section uses adapter collar for connection to 12" diameter vent system.

For fuel conservation and stable burner performance, the vent connection from the boiler should not include a barometric draft control or other opening unless the venting system can develop an excessive draft, or is required by code.

Page 3
Image 3
Smith Cast Iron Boilers Table Of Contents, 19A SERIES BOILER INSTALLATION INSTRUCTIONS, General, Boiler Location