A s s e m b l y
| Slide bag over dis- |
Lift discharge | charge chute. |
chute and slide | Make sure bag |
bag over chute. | noose fits over top |
Make sure bag | of discharge chute |
noose fits over | and notch in chute |
top of discharge | bottom. |
chute and notch |
|
in chute bottom. |
|
Pull drawstring tight |
| Pull drawstring tight | |
|
| ||
2. Secure the hopper to the rotor housingReproductionusing (2) 5/16 | |||
| Not | for |
|
Figure 5A. Discharge Bag Installati n |
| Figure 5B. Discharge Bag | |
HOPPER |
|
| DISCHARGE BAG |
1. Attach the hopper to the rotor housing, using care to | Your unit comes equipped with a bag for collecting | ||
engage the metal lip of the hopper liner to the inside | debris as it exits the discharge chute. | ||
of the housing as shown in figure 3. |
| See figures 5A & 5B for installation. | |
|
|
| |
x 1/2 hex head bolts and (2) 5/16 flat washers. Do not | ENGINE OIL | ||
tighten hardware at this time. |
|
3.See figure 4. From the inside of the hopper, install (1)
4.Make sure the hopper is properly seated on the rotor housing, and then tighten all hardware securely.
Fill the engine oil sump with SAE 30 oil (5W30 for winter use). See page 16 for additional information and the location of the
9