DEALER SET-UP INSTRUCTIONS and PRE-SALE CHECKLIST for SNAPPER
EUROPEAN LARGE FRAME SNOW THROWERS
INTRODUCTION: The Snapper Large Frame Snow Throwers are shipped almost fully assembled and require minimal
STEP 1: HANDLES: Cut both wire ties that secure the control cables to the handles. Be very careful and DO NOT cut the control cables. Cut the wire tie that secures the chute crank to the handle. See Figure 1.
CUT CABLE TIE
THAT SECURES
CHUTE CRANK
LOOSEN NUT
REMOVE
CARDBOARD
CHUTE
CRANK
CUT CABLE TIES
ON BOTH
HANDLES
DO NOT CUT
CONTROL CABLE
FIGURE 1
STEP 2: HANDLES: Loosen handle nuts and speed control rod nut. Rotate handles up to the operating position. Remove shipping cardboard from in between handles. See Figure 1. Insert bolts through both upper
&lower handles and secure with nuts. Make sure the square necks of the bolts are recessed into the square holes of upper handles. Tighten nuts securely. See Figure 2.
SECURE UPPER
HANDLES WITH
BOLTS AND NUTS
TIGHTEN SECURELY
STEP 3: HANDLES: Cut both wire ties that secure the control levers to the handles. See Figure 3.
CONTROL
LEVER
CHECK “Z” BEND END OF CABLE
IS SECURELY INSERTED INTO
HOLE ON CONTROL LEVER
FIGURE 3
STEP 4: CABLES: Make sure that the cables are connected to the traction clutch rod and blower clutch bracket. IMPORTANT: Cables should have some slack and should not be under tension. Both controls must pivot freely. See Figure 4.
TRACTION | BLOWER | |
CLUTCH | ||
CLUTCH | ||
CABLE | ||
CABLE | ||
(LEFT SIDE) | ||
(RIGHT SIDE) | ||
|
TRACTION
CLUTCH
ROD
BLOWER
CLUTCH
BRACKET
FIGURE 4
FIGURE 2 | INSTRUCTION No. |
|