FIG. 6

Keep a firm grip on the air conditioner, carefully

2 place the unit into the window opening so the bottom of the air conditioner frame is against the

window sill (FIG. 6 & FIG. 6A). Carefully close the window behind the top rail of the unit.

FIG. 6

FIG. 6A

3Extend the side panels out against the window frame (FIG. 7).

FIG. 7

5

Drive 3/4” (19mm) locking screws

through frame holes into window sash

(FIG. 10/11).

FIG. 10

FIG. 11

To secure lower sash in place, attach right

6 angle sash lock with 3/4” (19 mm) screw as shown (FIG. 12).

FIG. 12

4

Place the frame lock between the frame

extensions and the window sill as shown

(Fig. 8). Drive 3/4” (19 mm) locking screws through the frame lock and into the sill (FIG. 9). NOTE: To prevent window sill from splitting, drill 1/8” (3 mm) pilot holes before driving screws.

FIG. 8

FIG. 9

Cut foam seal and insert in the space

7 between the upper and lower sashes (FIG. 13).

FIG. 13

1 1/2” MIN

(38 mm)

8

Page 9
Image 9
Soleus Air GM-WAC-12ESE-C, GM-WAC-10ESE-C manual Fig. A, Fig. Fig