1.

Ensure ground is level with playing surface, then dig pole hole.

24" (61 cm)

WARNING!

GROUND SURFACE

24" (61 cm)

48" (121.9 cm)

PLAYING SURFACE

CONTACT UTILITIES BEFORE DIGGING.

48" (121.9 cm)

2.

Install nut (25) to J-bolt (19) as shown. Repeat procedure for remaining three J-bolts (19).

IMPORTANT!

Make sure nuts (25) are 2.75” (7 cm) from top of J-bolts

25

19

2.75”

(7 cm)

25

2

25

3.

Install threaded ends of J-bolts (19) through holes

 

 

in mounting plate (2) and secure as shown.

 

 

 

19

 

 

 

 

 

 

NOTE:

Make sure J-bolts (19) are in the illustrated position.

Nuts on the top of plate are used for leveling the pole after system is fully assembled.

5

06/05

ID# M855441

Page 5
Image 5
Spalding M8860411 manual Make sure nuts 25 are 2.75 7 cm from top of J-bolts