7A. | Rest top of pole on a piece of scrap wood (not included) and line up holes in pole to holes in |
| mounting plate (2) as shown. |
WARNING!
THREE PEOPLE REQUIRED FOR THIS PROCEDURE. FAILURE TO FOLLOW THIS WARNING COULD RESULT IN SERIOUS INJURY AND/OR PROPERTY DAMAGE.
PLAYING SURFACE
SCRAP WOOD
(NOT INCLUDED)
2
PLAYING SURFACE
7B. | Insert bolt (15) through holes in plate and pole and secure with nut (22). |
1
15
22
ID# M855441 | 06/05 | 8 |