SPX Cooling Technologies 160 manual Inlet Piping Plan, 4OWER, $Imensions, Odel, Per #Ell

Models: 160

1 12
Download 12 pages 16.49 Kb
Page 10
Image 10
/ Inlet Piping Plan /

/ Inlet Piping Plan /

L TOWER

C

E

FACE OF A DIA.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

INLET FLANGE

 

C

 

 

 

D TYPICAL MULTICELL

 

 

 

 

 

 

C

 

 

C

 

 

 

 

C

L COL.

 

 

L INLET

 

 

 

 

L

F MINIMUM

FAN L TOWER

C

Manual background PIPING SHOWN WITH HIDDEN LINES IS BY OTHERS

INLET

BASE OF TOWER COL.

B DIA. FLOW CONTROL VALVE

AND CROSSOVER PIPE

L INLET

C

G

4OWER

'0-

 

 

 

 

 

 

$IMENSIONS

 

 

 

 

 

-ODEL

PER #ELL

 

 

 

 

 

 

 

 

 

 

 

 

!

 

"

 

#

 

$

%

&

 

 

'

 

 

 

 

 

 

 



  

θ

 

θ

 

αθ

 

αθ

α 6Mθ

α

6

θ

α 6 θ

  

 θ

 

θ

 

 

α 6Mθ

α 6 θ

 

 

 

 

 

 

 

 

 



  

θ

 

θ

 

αθ

 

αθ

α 6Mθ

α

6

θ

α 6 θ

  

 θ

 

θ

 

 

α 6Mθ

α 6 θ

 

 

 

 

 

 

 

 

 



  

θ

 

θ

 

αθ

 

αθ

α 6Mθ

α

6

θ

α 6 θ

  

 θ

 

θ

 

 

α 6Mθ

α 6 θ

 

 

 

 

 

 

 

 

 



  

θ

 

θ

 

αθ

 

αθ

α 6Mθ

α

6

θ

α 6 θ

  

 θ

 

θ

 

 

α 6Mθ

α 6 θ

 

 

 

 

 

 

 

 

 



  

θ

 

θ

 

αθ

 

αθ

α 6Mθ

α

6

θ

α 6 θ

  

 θ

 

θ

 

 

α 6Mθ

α 6 θ

 

 

 

 

 

 

 

 

 



  

θ

 

θ

 

αθ

 

αθ

α 6Mθ

α

6

θ

α 6 θ

  

 θ

 

θ

 

 

α 6Mθ

α 6 θ

 

 

 

 

 

 

 

 

 

1. Use this bulletin for preliminary layouts only. Obtain current

4. Marley piping terminates at face of a cast iron flat face flange.

drawings from your Marley sales representative.

 

 

 

Bolt circle conforms to class 125 lb. ANSI B16.1 specifications.

2. Pumping head contributed by the tower is static lift shown

5. Supports on tower for crossover piping are furnished by Marley.

on page 7. Actual pumping head will vary according to tower

 

Do not support the riser’s dead load or operating load from the

circulating GPM. Total pumping head will be furnished at time of

 

tower. Do not brace the riser’s seismic or thrust loads against

proposal.

 

 

 

 

 

 

the tower.

 

 

 

 

 

3. If your application requires a bypass system, recommended

6. On Models 1611 through 1641 with a 32 or 3200 Geareducer

location is through tower endwall into plenum area. Review of

 

the inlet diameter must be 20.

 

 

 

 

the system by Marley engineering is required.

 

 

 

 

 

 

 

 

 

 

10

Page 10
Image 10
SPX Cooling Technologies 160 manual Inlet Piping Plan, 4OWER, $Imensions, Odel, Per #Ell