Install the piping according to the piping diagrams in Figure 3 on page 14, Figure 4 on page 14, and Figure 5 on page 15.
Figure 3: Cooling Tower with Tower Reservoir Piping Diagram
Type 2 pressure gauge
Type 2 inlet
Type 2 balancing valve
TWR
P
TWR
Support piping to eliminate
Caution! | Cooling tower |
| |
Do not apply |
|
| |
excessive torque | Typical bottom outlet | ||
to fittings | |||
|
| 3/4" constant bleed | |
|
| 3/8" drain line | |
| NOTE: Drain line is intended to prevent | ||
|
| tower | |
| TR |
| |
Overflow |
| TWS | |
|
| ||
3/4" constant | Strainer basket |
| |
bleed | Makeup | ||
| |||
|
| ||
| Tower water | P | |
|
| ||
Drain | reservoir | ||
T |
| ||
|
|
load from tower casing
Bypass
TWR | Tower water return | |
TWS | ||
Tower water supply | ||
| ||
| City water |
To drain
Figure 4: Cooling Tower with Basin as Reservoir Piping Diagram
Pressure |
| Inlet |
| 1/4" swing check valve |
|
| Balancing valve |
| 12" above highest point |
| |
gauge |
|
|
| ||
|
|
| in return line |
| |
Caution! | P | TWR | 3/4" constant bleed | TWR | |
|
| TWS | |||
Do not apply |
|
| |||
excessive torque |
|
|
|
|
|
to fittings |
|
|
|
|
|
Overflow |
| Makeup |
|
|
|
|
|
|
|
| |
| Cooling | City water line |
|
|
|
| tower | Building |
|
|
|
|
| exterior |
|
|
|
Drain | Side outlet |
| TWS |
| |
|
|
| |||
| TR |
|
| To drain |
|
To drain |
|
|
|
| |
|
|
|
|
| |
Support piping to eliminate |
|
|
|
| |
|
| in piping (1/2" fitting) | P |
| |
load from tower casing |
| TR |
|
| |
|
|
|
| ||
|
|
|
|
|
Bypass
Tower water return Tower water supply
City water
Fiberglass Cooling Towers | Chapter 3: Installation | Page 14 of 25 |