Sterling SC3-600, 25001301 warranty Inspection, System Warranty, Installation, Unit Location, Sound Vibration

FAQ

What should be done during the inspection process?

Responsibility should be assigned to a dependable individual for material reception. Each shipment should be carefully checked against the bill of lading to report any shortages or damages to the delivering carrier.

What are the conditions for maintaining the system warranty?

The system must be installed and maintained according to industry standards, including proper system piping, leak checking, power supply conditions, and connected controls.

What are the recommended unit location and installation practices?

Units are designed for outdoor applications and should be mounted on a roof or concrete slab following specific guidelines. It is important to consider potential injury hazards and air recirculation conditions during installation.