Sterling SGM-250A manual Shipping Information, 2-1Unpacking and Inspection

Models: SGM-250A

1 18
Download 18 pages 3.23 Kb
Page 8
Image 8
Shipping Information

2

Shipping Information

 

 

2-1 Unpacking and Inspection

You should inspect your Sterling/Sterlco water management systems and products for possible shipping damage.

Thoroughly check the equipment for any damage that might have occurred in transit, such as broken or loose wiring and components, loose hardware and mounting screws, etc. In case of breakage, damage, shortage, or incorrect shipment, refer to the following sections.

2-2 In the Event of Shipping Damages

Important!

According to the contract terms and conditions of the Carrier,

the responsibility of the Shipper ends at the time and place of shipment.

The Carrier then assumes full responsibility of the shipment.

;Notify the transportation company’s local agent if you discover damage.

;Hold the damaged goods and packing material for the examining agent’s inspection. Do not return any goods to Sterling/Sterlco before the transportation company inspection and authorization.

;File a claim against the Transportation Company. Substantiate the claim by referring to the agent’s report. A certified copy of our invoice is available upon request. The original Bill of Lading is attached to our original invoice. If the shipment was prepaid, write us for a receipted transportation bill.

;Advise Sterling/Sterlco. regarding your wish for replacement and to obtain an RMA (return material authorization) number.

Page 8

Water Management Systems and Products

Page 8
Image 8
Sterling SGM-250A manual Shipping Information, 2-1Unpacking and Inspection, 2-2In the Event of Shipping Damages