Manuals
/
Brands
/
Baby
/
Card Game
/
Sterling
/
Baby
/
Card Game
Sterling
SSIL, SSL
- page 41
1
41
66
66
Download
66 pages, 1.68 Mb
41
Figure 10: Proportioning Cycle
Contents
Main
Page
Shipping Information
Unpacking and Inspection
In the Event of Shipping Damages Important!
If the Shipment is Not Complete
If the Shipment is Not Correct
Returns Important!
Table of Contents
CHAPTER 3: INSTALLATION ..................................................17
CHAPTER 4: SERIES ONE CONTROLLER OPERATION ......21
Page
Chapter 1: Safety
Chapter 2: Functional Description
2-1 Introduction
2-2 Necessary Documents
2-3 Equipment Function
2-4 Models Covered in this Manual
2-5 Standard Operational Features
Page
2-6 Available Options
Page
Page
14
F
SSL/CSL Series Dimensions, Specifications, and Maximum Machine-Side Throughput
American Standards
Metric Standards
Page
Page
Chapter 3: Installation
3-1 Work Rules
3-2 Safety Considerations
3-3 Necessary Tools
3-4 Mounting SSL/CSL and SSIL/CSIL Hopper Loaders
Important!
We are not responsible for equipment damage from excessive processing machine vibrations.
3-5 Mounting Tips
3-6 Attaching the Pickup Wand
3-9 Installing the Remote Control Box
1.
3-10 Adjusting the Proximity Switch
Page
Chapter 4: Series One Controller Operation
4-1 Pre-Startup Checklist
4-2 Operating Sequence
MPBEFS
BVUP
!
4-5 Selecting the Most Efficient Loading Sequence
Note: Figure 7 contains two (2) different programs (12 and 14 blowback pulses)
Figure 7: Conveying Dip Switch Chart, Program A0541578 SSL/CSL 03 and SSIL/CSIL03 Models
Note: Figure 9 contains two (2) different programs (6 and 7 blowback pulses).
4-6 Shutting Down the Hopper Loader Using the Series One Controller
-Notes-
Move the power switch on the Series One graphic panel to the OFF
Chapter 5: Series One Plus Controller Operation
5-1 Pre-Startup Checklist
Figure 9: Series One Plus Graphic Panel
BVUP
S
MPBEFS
SERIES ONE PLUS
ADJUSTMENTS MADE WHILE RUNNING
TM
5-2 Operating Sequence
5-3 Series One Plus Controls and Displays
S
5-4 Starting Up the Hopper Loader for the First Time Using the Series One Plus Controller
Page
PLUS
8.
n.nn
The BLOWBACK LED flashes and the screen displays
----
FULL
as a four-(4) -pulse blowback cycle occurs.
Note: You can adjust number of blowback pulses from 0 to 16 pulses.
5-6 Operating the Proportioning Feature
1.
P. nn
5-7 Using the Batch Counter
FULL
0
)
5-8 Operating in Single-Shot Mode
1.
AEC
Press and hold the
1
AEC
5-11 Series One Plus Operating Parameter Menus
Note: To optimize operation, set the timer in this menu to approximately
0
Er.1
Page
Er. 1
2
Er. 2
Note: When operating in this mode, the
Er. 2
5-12 Shutting Down the Hopper Loader using the Series One Plus Controller
Chapter 6: Series One Plus SPI Communications
6-1 SPI Network Functions
Alarm acknowledgment
Note: To exit the self-test, youll need to perform a complete reset:
6-3 Operating under SPI Control
Chapter 7: Maintenance
7-1 Routine Maintenance
!
BEFORE
Page
Page
Page
Page
Page
Page
Page
Page
Page
SSL/CSL and SSIL/CSIL Series Sight Glass Hopper Loaders 59
Chapter 8: Troubleshooting
Page
AEC
Page
Er. 1
3
5
Er.
Er. 2
7
HOLD
9
8
Technical Assistance
Parts Department
Service Department
Sales Department
Contract Department