STT 110 / STT 160

7.1. Tansport and Packing

»

F

Please ensure adequate carrying capacity of the lifting equipment. Note that the dryer system is top-heavy. Risc of toppling!

The machine must not be tilted or laid on its side.

The equipment pass a rigorous operating test in the factory and are packed carefully to avoid transport damage.

Please check packing on delivery for transport damage.

The inlet and discharge flanges are sealed with plugs, so that no dirt can enter during transport. Plugs must be removed before assembly.

Packing materials should be disposed of according to environmental laws or reused.

The dryer or the compact unit is delivered on a pallet.

The dryer should only be moved by means of the appropriate lifting equipment (e. g. a fork lift truck or a workshop crane).

Fasten the transport cables to the eyelets of the control cabinets.

Transport must be shock-proofed and free from vibrations.

SM2-605

Transport, Assembly and Storage 7-2

Page 42