2.4 FLOOR STAND INSTALLATION
To install the F144 on the floor stand, follow the steps outlined below.
1.Uncrate the floor stand and place in an upright posi tion.
NOTE
Detailed instructions are included with each floor stand.
2.Place a spirit level across the top of the stand to check for level condition, side to side and front to back. If adjustment is necessary, level the stand by turning the bottom part of each caster in or out, then tighten the lock nut, and lock caster.
3.Remove the four legs from the freezer and replace with the four leg adapters provided. Adapters must be fully tightened to the freezer.
4.Place the F144 freezer on the floor stand with the front of the freezer to the door end of the stand. Secure the freezer to the stand with the nuts and lock washers provided. Then separate freezer base gasket and install the seam to the back and the flat to the bottom (Fig. 7).
2.5INSTALLING PERMANENT WIRING
WARNING
High voltage will shock, burn or cause death. Turn off and lock out main power disconnect before proceeding with installation. Do not operate machine with cabinet panels removed.
Electrical materials, arrangement and grounding must conform with national and local electrical codes. If permanent wiring is required by local codes, the following procedure must be performed:
A.Remove the back panel.
B.Disconnect the wires from the terminal block. Discon- nect the green ground wire from the grounding stud.
Figure 8. Power Cord Connection
C.Remove the power cord.
D.Install permanent wiring according to local code.
E.Replace the back panel.
Fig. 7. F144 with Floor Stand
5