INSTALLATION INSTRUCTIONS

SITE REQUIREMENTS

1. FLUE AND CHIMNEY REQUIREMENTS

NOTE: This appliance can only be installed in conjunction with the flue supplied.

1.1The flue must be sited in accordance with BS5440: Part 1 (latest editon). See diagram 1.

1.2Any terminal which is less than 2 metres above any access (level ground, balcony or above a flat roof to which people have access), is to be fitted with the guard.

1.3All vertical and horizontal flues must be securely fixed and fire precautions followed in accordance with local and national codes of practice.

1.4A restrictor may be required. Refer to Technical Specifications on previous page.

1.1 TIMBER FRAMED BUILDINGS

1.5It will be necessary to provide additional clearance when the fire passes through a wall containing any combustible materials so as to prevent a fire hazard.

1.6The hole through which the flue will pass, must have a steel sleeve which is positioned so that an air gap of at least 25mm is maintained between the outer surface of the flue, and any part of the sleeve.

1.7For further guidance on the installation of gas appliances in timber framed buildings, contact your local buildings control authority.

NOTE: ATTENTION MUST BE GIVEN TO ALLOWING ADEQUATE CLEARANCE AT THE SIDES AND REAR OF THE STOVE, TO PROVIDE ACCESS FOR SERVICING.

1

AR0602

9

Page 9
Image 9
Stovax 8545LUC, P8545LUC, 8547LUC-P8547LUC manual Site Requirements, Flue and Chimney Requirements, Timber Framed Buildings