1.Gain access to the AC power sequencers.

See the documentation that came with the expansion cabinet.

2.Route the power cable from the Ultra 2 host under the expansion cabinet frame on the same side as the power sequencer.

3.Plug the power cord from the Ultra 2 host into the top power connector of either power sequencer (FIGURE 1-5).

The power connectors are located on the other side of the power sequencer from the main switch.

4.Reassemble the expansion cabinet.

See the documentation that came with the expansion cabinet.