1.Gain access to the AC power sequencers.
See the documentation that came with the expansion cabinet.
2.Route the power cable from the Ultra 2 host under the expansion cabinet frame on the same side as the power sequencer.
3.Plug the power cord from the Ultra 2 host into the top power connector of either power sequencer (FIGURE
The power connectors are located on the other side of the power sequencer from the main switch.
4.Reassemble the expansion cabinet.
See the documentation that came with the expansion cabinet.