Contents
Preface xi
1.Watchdog Timer 1 Overview 1
PICL
Watchdog Node Management Code 5
OpenBoot PROM Interface 21
2. Environmental Monitoring | 23 |
|
|
Environmental Monitoring Component Compatibility | 24 | ||
Typical Environmental Monitoring System Application | 24 | ||
Typical Cycle From Power Up to Shutdown | 26 |
| |
Environmental Monitoring Protection at the OpenBoot PROM 26 | |||
Environmental Monitoring Protection at the Operating System Level 26 | |||
Post Shutdown Recovery | 27 |
|
|
Hardware Environmental Monitoring Functions 28 |
| ||
Switching Power On and Off 31 |
|
| |
Inlet, Exhaust, and CPU Temperature Monitoring | 31 | ||
Adjusting the Environmental Monitoring Warning, Critical, and Shutdown | |||
Parameter Settings on the Board 32 |
|
| |
OpenBoot PROM Environmental Monitoring | 33 |
|
iii